|
 |
Would you like a receipt? como usar corega p fixador EDF had said at the end of 2012 that tweaks to the EuropeanPressurised Reactor's (EPR) boiler design, additionalengineering studies and post-Fukushima rules had lifted thepilot project's cost to 8.5 billion euros ($11.1 billion).
2021-9-8 7:17:20 |
|
|